arron wrote:With this massive recreation project (Mosaic and the Field House) completed, I bring up the lack of any parking for either.
City Council voted (not all for) to take money from the Contingency Fund to pave the Field House parking lot. This SHOULD HAVE been included in the original construction costs. Bloody dumb design-build procedure; BRAIN DEAD stuff, designed to allow COWBOY POLITICS to spend much more taxpayers money than necessary...
Our infrastructure is in horrible shape and these people SAY the WHL demanded we upgrade the "Can" or build a new arena. COWBOY POLITICS decreed, without much thought, that a new one would be built. Damn the cost. Build it downtown where certain people might benefit by having the city purchase their property; no concern that it was the worst possible site available in terms of traffic parking and flow.
Sidebar - the "wonderful" design-build process left out a few things at Mosaic...
Parking, support for music concert event lighting nonexistent, horrible setup for semi trailers to get to Mosaic's large door and...
...an architectural design that will dump major snow westerly down River Street and beyond (Do not believe me? Go to 200 or 300 block of Home Street W. on South Hill, look at Mosaic, and imagine a fierce winter storm from the west dumping a meter of snow on us... with a 70 kph wind from the west running that snow down the airplane wing [venturi effect - accelerates it] of Mosaic and onto River St.).
Wow this arron person is like sledge on speed.
Talk about covering all the negative stuff (real or perceived) in record time, and with that inanimate CAPS lock button. Everything from parking, traffic flow, contigency funds, pavement,construction, BRAINs that are dead, COWBOYs (why bring them into this?), lighting, design build, semi trailer parking, winter storms,
AND (I like this one)
the VENTURI AFFECT of RIVER street.
lol